Name | Last modified | Size | Description | |
---|---|---|---|---|
Parent Directory | - | |||
01. atticbreaking.jpg | 2014-09-13 18:11 | 1.8M | ||
02. firstwindowopening.jpg | 2014-09-13 18:11 | 1.9M | ||
03. new windows.jpg | 2014-09-13 18:11 | 2.1M | ||
04. stripped attic.jpg | 2014-09-13 18:11 | 2.4M | ||
05. more breakage.jpg | 2014-09-13 18:11 | 2.5M | ||
06. me with my new doorframes.jpg | 2014-09-13 18:11 | 1.8M | ||
07. insulation is pro.jpg | 2014-09-13 18:11 | 2.3M | ||
08. new storage attic with electric tubes for the rooms.jpg | 2014-09-13 18:11 | 2.1M | ||
09. metal frame for the first wall in place.jpg | 2014-09-13 18:11 | 2.1M | ||
10. first plaster plate on the wall.jpg | 2014-09-13 18:11 | 1.9M | ||
11. those walls are next.jpg | 2014-09-13 18:11 | 1.9M | ||
12. right wall closed.jpg | 2014-09-13 18:11 | 2.0M | ||
13. walls all closed on one side, time for electric tubing.jpg | 2014-09-13 18:11 | 1.8M | ||
14. new window frames on the inside carpented, ready for insulation around them.jpg | 2014-09-13 18:11 | 1.9M | ||